日本熟妇一区二区三区,亚洲一区人妻在线,亚洲色在线九九久,女女亚成区视频,91久久精,日韩天堂久久在线,婷婷精品视频五区在线,五十路无码,久国产精品区

199-3021-7010

Star meters knowledge encyclopedia: input level transmitter should be how to install

At the beginning of the design of the input level transmitter, the shape is made strict examination. It is easy to measure the liquid level and install the transmitter. One end of the input level transmitter is the probe, which is used to feel the pressure of the measured liquid, and the other end is the power supply and signal lead. The input level transmitter has a cylindrical structure with a sealed thread at one end. The anti-clogging design of the input level transmitter probe is immersed in the measured medium for a long period of time, in order to prevent impurities from clogging the pressure transfer orifice, resulting in measurement distortion. The end of the input transmitter probe is protected and the liquid is introduced through the pilot hole, the position and angle of which have been tested hundreds of times. There are several different working conditions for field installation, which can be categorized as in a static medium and in a flowing medium. These two conditions are different for the installation of input level transmitter requirements. Installation in static level: When measuring the static level in the open container, the probe of the input level transmitter is directly put into the bottom of the container, and the cable (junction box) can be fixed at the opening of the container with nylon tape or three-legged adjustable mounting bracket. Installation in flowing liquid level: When measuring the level in the flowing liquid, due to large fluctuations in the medium, you can insert a steel pipe larger than the diameter of the probe into the liquid, and at the same time, play a number of small holes in the wall of the pipe at different heights on the opposite side of the water flow direction, so that the liquid flows into the pipe. Another method is to add a damping device at the bottom of the liquid to filter sediment and eliminate the effects of dynamic pressure and waves on the input level transmitter installation and measurement. Note that the installation direction of the input level transmitter should be vertical, and the installation position should be far away from the liquid inlet and outlet and agitator. In the use of occasions with large vibration, you can wind steel wire on the transmitter, using steel wire shock absorption, so as not to pull off the cable wire. There are three points of attention before installation: 1, the material of the measured medium must be compatible with the material of the input level transmitter. 2, the measured medium can not block the input level transmitter pressure hole. 3, the measured medium may produce static pressure can not exceed the input level transmitter range.
德昌县| 乡宁县| 马龙县| 美姑县| 呼伦贝尔市| 揭西县| 同江市| 永德县| 武清区| 左贡县| 吉水县| 儋州市| 卢湾区| 岳阳市| 贵溪市| 阿瓦提县| 武汉市| 民乐县| 息烽县| 安溪县| 中方县| 防城港市| 从江县| 甘泉县| 车险| 阳原县| 磐石市| 密山市| 平乡县| 嵩明县| 江城| 米林县| 文昌市| 商河县| 屏东市| 齐河县| 阿克陶县| 射阳县| 锡林郭勒盟| 疏附县| 新竹市|